What you will be able to do
Know the condition. Understand the obligation.
- Tell disclosure, investigation, repair and contractual remedies apart.
- Apply the federal lead rules, including current exceptions, timing and agent responsibilities.
- Recognize indoor hazards, groundwater concerns, tanks, waste sites and flood risks.
- Match Clean Air, Clean Water, CERCLA, SARA and NEPA to their actual purposes.
- Distinguish Phase I, Phase II and AAI, and recognize the limits of liability protections.
- Choose a documented next step without inventing a nationwide state-law rule.
Covers both parts of N6: 9 of 80 scored national items. Environmental conditions account for five items and disclosure obligations for four. Pearson specifies five knowledge, three application and one analysis item. This 56-question learning set covers the objectives; its size is not an exam quota. Two flood-insurance questions are also tagged to the specific N7.B lender-requirements objective.
Make it manageable
Take it in four short sittings.
Read a few sections, try the worked examples without opening the answer, then come back for the next stage.
Before you choose an answer
Find the condition, the duty and the next step.
- Identify the evidence. Known condition, warning sign, report or unsupported assumption?
- Identify the duty. Disclosure, investigation, evaluation opportunity, repair or continuing obligation?
- Check the governing rule. Federal requirement, state law, contract term or agency recommendation?
- Read every exception condition. Building age alone is rarely the whole test.
- Protect the decision deadline. Share required facts, obtain qualified help and document the next step.
01 / N6.B · Understand the rule
Disclosure, inspection and repair: three different jobs
A disclosure tells a prospective buyer or tenant something the law requires them to know. An inspection investigates a condition. A repair changes it. Delivering a disclosure doesn’t prove the building is sound, and hiring an inspector doesn’t erase the seller’s or agent’s disclosure duties.
For a national question, identify the property, transaction, person with knowledge and law being applied. Federal lead rules have their own scope. General seller forms, timing, exemptions, update duties and remedies depend on state law. There is no single federal seller-condition form for every property sale.
Pennsylvania is one application of this. Its seller law generally requires disclosure of known material defects before the agreement is signed, with its own scope and exceptions. A Pennsylvania exemption doesn’t carry over to another state or to the federal lead rule. The linked PA lesson covers the state requirements in detail.
Work the example
A buyer orders a home inspection. The listing agent already knows the basement floods during heavy rain.
Does ordering the inspection eliminate required disclosure?
Show the answer and reasoning
No. Investigating and disclosing are different duties.
The inspection may add information, but it doesn’t excuse withholding a known condition that must be disclosed.
An inspection never replaces the seller’s duty to disclose what the seller knows.
Sources for this section
- Pennsylvania authority68 Pa.C.S. chapter 73, seller disclosure duties and remedies
- Pennsylvania authority49 Pa. Code § 35.284a, licensee disclosure responsibilities
- Federal law40 CFR § 745.107, lead information, reports and deliveryStatute or regulation reproduced by Cornell's Legal Information Institute.
02 / N6.B · Understand the rule
Recognize a fact that could change the decision
A material fact is important enough to affect a reasonable transaction decision under the governing standard. A material property defect can affect value, use or safety. A failing foundation, recurring roof leak, unsafe wiring, sewage backup or contaminated well calls for more than a reassuring sales description.
Latent means hidden or not readily apparent on ordinary observation. Patent means apparent or readily observable. These terms describe visibility, not importance. An obvious condition can still require disclosure, and a hidden one isn’t known to the seller just because it exists.
Consider structural systems, roof and drainage, plumbing, heating and electrical equipment, water and sewage service, pests, permits and known use restrictions. Report facts and the source of your information accurately. An agent can identify a concern and arrange qualified evaluation without diagnosing a foundation or certifying electrical safety.
Work the example
Behind new wall panels, the seller knows a foundation crack admits water. Buyers cannot see it during a showing.
Which distinction matters?
Show the answer and reasoning
It is a known hidden condition that may be material.
New panels don’t turn the seller’s knowledge into an unknown condition. The disclosure rule still applies.
Latent = hidden. Material = important to value, use or safety. A defect can be both.
Sources for this section
- Pennsylvania authority68 Pa.C.S. § 7102, material defect and storm water definitions
- Pennsylvania authority68 Pa.C.S. chapter 73, seller disclosure duties and remedies
- Pennsylvania authority49 Pa. Code § 35.284a, licensee disclosure responsibilities
03 / N6.B · Understand the rule
Read what the inspection actually covers
A general home inspection usually examines accessible systems under an agreed scope. It isn’t a lead inspection, radon test, asbestos survey, septic evaluation, well-water analysis or commercial environmental site assessment unless the agreement says so. An appraisal addresses value; it doesn’t substitute for the buyer’s inspection.
Read limitations, inaccessible areas, findings and recommendations. A report that could not inspect a covered crawlspace has a gap, not a clean bill of health for that space. Refer structural, environmental, legal and other specialist questions to people qualified for the task.
How much an agent must investigate varies by state. Pennsylvania doesn’t require an independent investigation just to confirm the seller’s form, but an agent who actually knows of an undisclosed material defect must disclose it in writing. Other states can require broader inquiry.
Work the example
A general inspector excludes radon testing from the engagement. The report identifies no major structural concern.
Has the report established a low radon level?
Show the answer and reasoning
No. Radon needs its own properly conducted test.
You can’t infer a result for a test that was outside the agreed scope.
If it wasn’t in the scope, the report says nothing about it.
Sources for this section
- Federal sourceEPA, Home Buyer’s and Seller’s Guide to Radon
- Pennsylvania authority49 Pa. Code § 35.284a, licensee disclosure responsibilities
- Pennsylvania authorityPennsylvania seller disclosure law, required disclosures and seller duties
04 / N6.B · Understand the rule
Follow new information through the transaction
A disclosure is a dated statement, not permission to ignore later facts. If a new leak, test result or official notice conflicts with earlier information, involve the broker, identify the governing update duty and provide the required correction promptly. Keep the report, amended disclosure and proof of delivery together.
A repaired condition may still need to be reported when the form or law asks about history. Describe the original issue, work performed and available records accurately. A paid invoice does not prove that every cause was corrected, and a warranty should not be invented.
A buyer’s remedy depends on the law, the contract, timing and the facts. There’s no nationwide three-day cancellation right for an updated condition disclosure. Track inspection and notice deadlines while the parties get advice. Pennsylvania’s chapter 73 has its own correction rules.
Work the example
After signing the disclosure, a seller receives a report documenting an active roof leak before closing.
What should the agent do with the new report?
Show the answer and reasoning
Address the correction and delivery duties with the broker promptly.
A completed form doesn’t justify ignoring a newly documented contradiction.
New report contradicts the disclosure? Tell the broker and correct it before closing.
Sources for this section
- Pennsylvania authority68 Pa.C.S. chapter 73, seller disclosure duties and remedies
- Pennsylvania authority49 Pa. Code § 35.284a, licensee disclosure responsibilities
05 / N6.B · Understand the rule
What an as-is clause does, and what it doesn’t
An as-is clause concerns the condition in which the buyer accepts the property and whether the seller will make repairs. Read the actual contract. It doesn’t authorize fraud, concealment or leaving out legally required disclosures. A buyer can still negotiate inspection rights, repairs or a termination condition.
Whether a seller is exempt from a particular disclosure form is a different question from an agent’s duties and liability for false statements. A buyer who skips the inspection doesn’t make known facts disappear. Never advise a seller to paint over evidence so the buyer won’t ask.
Confidentiality never requires carrying out an unlawful concealment instruction. Explain the duty, consult the supervising broker and refuse to take part. Don’t make promises about lawsuits or deposit release; those depend on the law and the contract.
Work the example
An owner says, “We are selling as is, so do not mention the recurring sewage backup.”
Does the clause settle the disclosure issue?
Show the answer and reasoning
No. Apply the disclosure duty despite the as-is label.
As-is terms allocate repair responsibility. They aren’t permission to hide a known material problem.
As-is limits repairs. It never permits hiding a known material defect.
Sources for this section
- Pennsylvania authorityPennsylvania seller disclosure law, required disclosures and seller duties
- Pennsylvania authority68 Pa.C.S. chapter 73, seller disclosure duties and remedies
- Pennsylvania authority49 Pa. Code § 35.284a, licensee disclosure responsibilities
06 / N6.B · Understand the rule
Psychological stigma versus physical defects
Stigma is a negative perception attached to a property, such as a past death or crime there. Whether that history has to be volunteered varies by state and circumstance, so one state’s answer isn’t a national rule.
Pennsylvania’s Milliken v. Jacono decision treats purely psychological stigma from a murder-suicide as outside the material-defect disclosure requirement. That’s a PA rule. Physical damage, contamination or another material condition is a different issue, and false answers or deceptive statements raise their own problems.
When a buyer asks about a sensitive history, identify what is actually known and check the governing rule with the broker or counsel. Do not invent a history, repeat rumor as fact or use personal information about former occupants to steer housing choices.
Work the example
A national question identifies a prior death but gives no state rule and no physical defect.
Can you apply Pennsylvania’s stigma decision everywhere?
Show the answer and reasoning
No. The jurisdiction and facts matter.
A state-specific rule doesn’t set the disclosure obligation in other states.
Stigma rules vary by state. Physical damage from the same event still needs disclosure analysis.
Sources for this section
- Pennsylvania authorityPA Supreme Court, Milliken v. Jacono (2014)
- Pennsylvania authority68 Pa.C.S. § 7102, material defect and storm water definitions
- Pennsylvania authorityPennsylvania seller disclosure law, required disclosures and seller duties
07 / N6.A · Understand the rule
Recognize why old paint needs care
Lead-based paint may remain in housing built before 1978. Deteriorating paint, contaminated dust and contaminated soil can create exposure. Friction and impact surfaces, such as windows and doors, deserve attention even when much of the paint looks sound. Age suggests a reason to investigate; it does not prove the result of a test.
A lead inspection determines whether and where lead-based paint is present. A risk assessment evaluates the existence, nature, severity and location of lead-based paint hazards. Neither is the same as a general home inspection or an informal look at paint color.
Each task has a different purpose: disclosure shares required information, evaluation investigates, interim controls reduce exposure temporarily, and abatement is designed to permanently eliminate lead-based paint hazards. Use qualified professionals. Don’t scrape a sample during a showing or tell a buyer that fresh paint makes a home lead-free.
Work the example
A buyer wants to know whether the paint contains lead and where it is located.
Which service directly addresses that question?
Show the answer and reasoning
A lead-based paint inspection.
A risk assessment focuses on hazards, while an inspection identifies the presence and location of lead-based paint.
Inspection: where is lead paint? Risk assessment: what hazards exist? Abatement: permanent removal.
Sources for this section
- Federal law40 CFR § 745.103, current target housing and lead definitionsStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal law40 CFR § 745.223, lead abatement and activity definitionsStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal sourceEPA, real estate disclosures about potential lead hazards
- Federal sourceEPA, lead renovation, repair and painting rules
08 / N6.B · Understand the rule
What counts as target housing
Federal disclosure generally covers housing built before 1978, whether sold or leased, including subleases. Check both the target-housing definition and the transaction exceptions. A state seller-disclosure exemption, an estate sale or a family with no children doesn’t take an ordinary pre-1978 home out of federal coverage.
The current definition excludes housing for the elderly or people with disabilities and zero-bedroom dwellings, unless a child under six lives there or is expected to. Zero-bedroom means the living area isn’t separated from the sleeping area. The older shorthand that studios are always excluded is wrong.
The transaction exceptions are a foreclosure sale; a lease of housing certified lead-based-paint free; a lease of 100 days or less with no renewal or extension possible; and a renewal after full earlier disclosure when no new information exists. The certified lead-free exception applies only to leases. A bank’s later resale isn’t the foreclosure sale itself.
Work the example
A 1960 studio will be occupied by a parent and a four-year-old. No transaction exception applies.
Is the zero-bedroom exclusion enough to avoid federal disclosure?
Show the answer and reasoning
No. The under-six occupancy condition brings it within the current definition.
Read the entire exception, including who lives or is expected to live there.
Target housing: built before 1978. Studios and senior housing are covered if a child under six lives there.
Sources for this section
- Federal law40 CFR § 745.103, current target housing and lead definitionsStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal law40 CFR § 745.101, federal lead transaction exceptionsStatute or regulation reproduced by Cornell's Legal Information Institute.
09 / N6.B · Understand the rule
Deliver lead information before the buyer is bound
Before a purchaser or tenant is obligated in a covered transaction, provide the EPA-approved pamphlet, disclose known lead-based paint and hazards, and supply available records and reports. Include required warnings, acknowledgements and certifications in the sale or lease documentation. Use the official language in a transaction, not a study paraphrase.
Available records include information in the owner’s possession or reasonably obtainable. In a multifamily property, common-area reports count, as do reports about other units when they form part of a building-wide evaluation or reduction program. Do not select only the reassuring pages.
Unknown lead status does not excuse the pamphlet and required acknowledgements. The disclosure rule itself does not require the seller or landlord to test for or remove lead. If an offer arrives first, complete disclosure before acceptance and allow the offeror to review the information and possibly amend the offer.
Work the example
A seller has a lead report for a building’s shared hallway but none for the particular apartment being sold.
May the seller omit the common-area report?
Show the answer and reasoning
No. Available common-area reports are included.
The federal rule is not limited to reports from inside the individual unit.
Pamphlet, known information and available reports, all before the buyer or tenant is obligated.
Sources for this section
- Federal law40 CFR § 745.107, lead information, reports and deliveryStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal law40 CFR § 745.113, lead certifications and record retentionStatute or regulation reproduced by Cornell's Legal Information Institute.
10 / N6.B · Understand the rule
How the ten-day lead evaluation window works
For a covered purchase, the default lead inspection or risk-assessment opportunity is ten days. The parties may agree in writing to a different period. The purchaser may waive the opportunity in writing. The rule does not give tenants that same ten-day inspection entitlement.
Waiving evaluation doesn’t waive disclosure of known information, delivery of available reports, the pamphlet or required contract language. Ten days isn’t a general cooling-off period, and it doesn’t describe every contract cancellation procedure.
Check how the agreement preserves the opportunity before the purchaser becomes obligated, and how notices must be given. Do not assume that delivering a lead attachment at closing cures earlier noncompliance. If timing is already wrong, involve the broker and appropriate counsel before making promises about the effect.
Keep the lead duties separate
Seller disclosure
- Rule
- Known information, available records, pamphlet and required documentation before obligation
- Watch for
- Unknown status is disclosed; it does not require the seller to invent a test result.
Purchaser evaluation
- Rule
- Generally 10 days, changed by mutual written agreement or waived in writing by purchaser
- Watch for
- The 10-day evaluation opportunity is for buyers. Tenants don’t get one.
Renovation work
- Rule
- RRP rules apply to paid work that disturbs paint
- Watch for
- A signed disclosure form does not certify a contractor or authorize unsafe work.
Work the example
A purchaser waives the lead evaluation opportunity in writing. The seller has a positive lead report.
Can the report now be withheld?
Show the answer and reasoning
No. Only the opportunity to evaluate was waived.
The buyer waived the chance to test, not the right to receive what the seller already knows.
Buyers get 10 days to test unless they agree otherwise or waive in writing. Tenants don’t get it.
Sources for this section
- Federal law40 CFR § 745.110, purchaser evaluation opportunity and written waiverStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal law40 CFR § 745.107, lead information, reports and deliveryStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal law40 CFR § 745.113, lead certifications and record retentionStatute or regulation reproduced by Cornell's Legal Information Institute.
11 / N6.B · Understand the rule
Know the agent’s role and retain the evidence
An agent covered by the federal rule must inform the seller or lessor of the obligations and ensure the required activities occur, or personally ensure compliance. The regulation’s definition of agent is specific; it excludes a purchaser’s representative who receives all compensation from the purchaser. State duties may still apply to that representative.
After giving the required notice, the agent has limited protection for lead information the seller or lessor knew but didn’t share with the agent. It doesn’t let the agent hide information the agent does know or skip required steps.
The seller and any agent keep the completed sale attachment for at least three years after completion of the sale. For a lease, the lessor and any agent keep the completed attachment for at least three years after commencement of leasing. Longer state or brokerage retention requirements may also apply. Keep evidence of delivery, reports and any written evaluation waiver with the file.
A knowing violation can make the violator liable to the purchaser or tenant for three times their damages. Civil penalties, injunctions and other enforcement can also apply. Penalty amounts are adjusted for inflation, so don’t memorize an old fixed figure. A violation doesn’t void every affected agreement.
Work the example
A covered lease begins on a stated date. The landlord signed its lead attachment two months earlier.
Which event starts the federal three-year retention period?
Show the answer and reasoning
Commencement of leasing.
The lease clock runs from when the lease starts, not from the earlier signature.
Keep lead attachments 3 years: from closing for sales, from the lease start for leases.
Sources for this section
- Federal law40 CFR § 745.115, agent compliance duties and limited protectionStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal law40 CFR § 745.103, current target housing and lead definitionsStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal law40 CFR § 745.113, lead certifications and record retentionStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal law40 CFR § 745.118, lead disclosure liability and enforcementStatute or regulation reproduced by Cornell's Legal Information Institute.
12 / N6.A · Understand the rule
Renovation rules (RRP) versus sale disclosure
Renovation, repair and painting can disturb old painted surfaces and create lead dust. EPA’s RRP program generally covers paid work that disturbs paint in pre-1978 housing and child-occupied facilities, with some exceptions. Covered firms and renovators need EPA certification and must follow lead-safe practices.
A signed sale disclosure doesn’t let an uncertified contractor skip those requirements. Routine property-management maintenance can fall within the program too. Some states run their own authorized programs, and local rules can add requirements.
Not every paint job is abatement. Abatement deliberately addresses lead hazards under a different set of rules; renovation may disturb paint while doing some other job. One pamphlet or one test doesn’t clear every project.
Try a different fact pattern
Change the lead disclosure facts
Six short scenarios. Pick a response, check the reasoning, then change the situation. These exercises are for learning; the linked practice saves your study history.
A seller is selling a 1960 house. Lead status is unknown and no transaction exception applies.
Work the example
A property manager hires a contractor to replace painted windows in a covered pre-1978 rental.
Does the tenant’s signed lead disclosure satisfy the renovation rules?
Show the answer and reasoning
No. The renovation work has its own requirements.
Disclosure rules govern the transaction; work-practice rules govern the job.
Paid work disturbing paint in pre-1978 housing needs an EPA-certified firm.
Sources for this section
- Federal sourceEPA, lead renovation, repair and painting rules
- Federal law40 CFR § 745.82, compensated renovation scope and exceptionsStatute or regulation reproduced by Cornell's Legal Information Institute.
13 / N6.A · Understand the rule
Focus on fiber release and qualified assessment
Asbestos was used in insulation, floor materials and other building products. The concern is inhalation of airborne fibers. Friable material can crumble under hand pressure when dry, making fiber release a particular concern. Damage, cutting, sanding or improper removal can release fibers from material that was previously undisturbed.
You usually can’t confirm asbestos by looking. EPA recommends leaving sound material alone when it won’t be disturbed. Damaged material or planned renovation calls for assessment by a trained professional. A licensee shouldn’t take a sample or recommend do-it-yourself cleanup.
Options include management in place, encapsulation, enclosure or removal, depending on condition, the planned work and the rules that apply. Encapsulation seals the fibers; enclosure puts a barrier around the material. Neither makes the asbestos disappear, and there’s no general rule that all asbestos must be removed before a sale.
Work the example
Old pipe insulation is damaged, and the buyer plans to move the pipes.
What is the supported next step?
Show the answer and reasoning
Obtain qualified asbestos assessment before disturbing the material.
The damage and the planned work can release fibers, and looking at the material can’t settle what it is.
Asbestos risk comes from damaged or disturbed material. Leave sampling to professionals.
Sources for this section
- Federal sourceEPA, asbestos condition, assessment, repair and removal
- Federal law40 CFR § 61.141, asbestos and friability definitionsStatute or regulation reproduced by Cornell's Legal Information Institute.
14 / N6.A · Understand the rule
Use a test, not the neighborhood’s reputation
Radon is a naturally occurring radioactive gas from the breakdown of uranium in soil and rock. It can enter through foundation cracks and other openings; well water can be another source. You cannot establish the indoor level by sight or smell. A nearby home’s result and a county risk map do not replace testing the particular building.
EPA recommends fixing homes at 4 pCi/L or higher and considering a fix between 2 and 4 pCi/L. There’s no known safe level. Four is an action recommendation, not a legal pass/fail line, and 3.9 isn’t harmless. Choose test methods and follow-up that suit the transaction.
Use qualified testing and mitigation providers, preserve existing results and identify what any system was designed to do. A mitigation system does not remove the need to verify performance. Who pays, when work is completed and what result satisfies the contract are matters to address in the agreement and under state law.
Work the example
One home tests low. The seller claims the untested house next door must also be low.
Is that a reliable conclusion?
Show the answer and reasoning
No. Test the property being evaluated.
Radon levels can differ between neighboring homes and with building conditions.
Radon: EPA says fix at 4 pCi/L or above; consider fixing at 2 to 4.
Sources for this section
- Federal sourceEPA, Home Buyer’s and Seller’s Guide to Radon
- Federal sourceEPA, radon action recommendation and its limits
15 / N6.A · Understand the rule
Find the moisture source and avoid invented standards
Mold needs moisture. Roof leaks, plumbing failures, condensation and flooding can support growth. Cleaning or covering a stain without correcting the moisture source can leave the underlying problem in place. A musty odor or visible growth warrants attention, but an agent should not diagnose species or health effects from color.
EPA has no federal airborne mold concentration limit that a home can pass. When mold is visible, sampling usually isn’t needed to show there’s a problem. A professional may test for a specific purpose, but a lab number isn’t a guarantee of safety.
Document known water intrusion, reports and remediation accurately under the disclosure rules that apply. Repair, cleanup and proof of the work serve different purposes. Fresh paint isn’t mold remediation, and the lack of a federal numerical standard doesn’t remove disclosure duties.
Work the example
An owner paints over recurring mold while the leaking pipe remains unrepaired.
Has the source of the problem been addressed?
Show the answer and reasoning
No. The moisture source still needs correction.
Covering visible growth doesn’t remove the moisture that feeds it.
Mold: fix the moisture source first. There’s no federal mold limit to pass.
Sources for this section
- Federal sourceEPA, mold, moisture and the home
- Federal sourceEPA, mold sampling and absence of federal air limits
- Pennsylvania authority49 Pa. Code § 35.284a, licensee disclosure responsibilities
16 / N6.A · Understand the rule
Carbon monoxide, formaldehyde and their sources
Carbon monoxide is an odorless, colorless gas associated with incomplete combustion and faulty or poorly vented fuel-burning equipment. It is not radon. A suspect furnace or active alarm needs an appropriate safety response, not a sales assurance based on the absence of odor. Follow emergency instructions when a suspected exposure is occurring.
Formaldehyde can come from some building materials and household products, including certain composite wood products and some insulation. Product age or a smell doesn’t establish an exposure level.
Identify the likely source and refer evaluation to the right professional. A general home inspection doesn’t include every indoor-air test. Questions about alarms, ventilation, product restrictions and disclosure depend on the law and the facts.
Work the example
A buyer confuses a malfunctioning gas furnace’s combustion hazard with naturally occurring radioactive gas from soil.
Which hazard is associated with faulty combustion?
Show the answer and reasoning
Carbon monoxide.
Radon and carbon monoxide have different sources, even though neither can be judged reliably by smell.
CO comes from combustion. Radon comes from soil. Formaldehyde comes from pressed wood and other products.
Sources for this section
- Federal sourceEPA, carbon monoxide sources and indoor air
- Federal sourceEPA, formaldehyde and indoor air quality
- Federal sourceEPA, formaldehyde sources in building products
17 / N6.A · Understand the rule
Check the water source and the actual test
Groundwater can carry pollutants from leaking tanks, waste sites, failing septic systems, industrial operations or agricultural activity. Contamination may migrate beyond the parcel where it began. Clear, pleasant-tasting water is not proof that no harmful contaminant is present.
Federal public drinking-water standards don’t regulate a private well the way they regulate a public water system. Owners need their own testing and should check state and local requirements. EPA recommends testing private wells every year for total coliform bacteria, nitrates, total dissolved solids and pH, plus other tests based on local conditions.
A test only addresses the substances, locations and time covered by its sampling. A bacteria-only report says nothing conclusive about solvents or petroleum. Obtain relevant records, identify nearby potential sources and use a qualified laboratory and professional advice. Do not promise that boiling water removes chemical contamination.
Work the example
A private well passes a bacteria test next to a former industrial site. No solvent analysis was performed.
Does the result rule out solvent contamination?
Show the answer and reasoning
No. The report did not test that question.
Testing must match the suspected substances and appropriate sampling plan.
Private wells: test yearly for coliform, nitrates, TDS and pH, plus any local concern.
Sources for this section
- Federal sourceEPA, private-well testing and contamination sources
- Federal sourceCDC, private-well testing and public-system distinction
- Federal sourceEPA, underground tank definition, risks and federal exclusions
18 / N6.A · Understand the rule
Follow contamination into the building
Vapor intrusion occurs when vapor-forming chemicals below ground migrate into an overlying building. Contaminated soil or groundwater can release vapors that enter through cracks, utility openings and other pathways. A former dry-cleaning or fuel use can matter even when no chemical container remains on site.
The source may be on a neighboring parcel. Property lines don’t stop a groundwater plume or soil gas. Indoor products can give off some of the same chemicals, so a professional has to sort out the sources instead of assuming every reading comes from below ground.
A paved surface, a remodeled interior or a municipal water connection doesn’t settle the vapor question. Review historical uses, investigation results and mitigation controls with an environmental professional. No visible staining doesn’t mean a property is environmentally clear.
Work the example
A building uses municipal water, but contaminated groundwater beneath it contains volatile solvents.
Can the groundwater still matter to occupants?
Show the answer and reasoning
Yes. Vapors may enter the building through the subsurface pathway.
Not drinking the groundwater doesn’t eliminate every exposure route.
Vapor intrusion: contamination below ground can reach indoor air even with city water.
Sources for this section
- Federal sourceEPA, vapor intrusion pathways
- Federal sourceEPA, Phase I and Phase II assessment and cleanup follow-up
19 / N6.A · Understand the rule
Which tanks the federal UST rules cover
A federal underground storage tank system is a tank plus its connected underground piping with at least 10 percent of their combined volume underground. Federal UST rules cover systems storing petroleum or certain hazardous substances, with some exclusions.
Some tanks fall outside the federal UST program, including heating-oil tanks used on the premises and farm or residential motor-fuel tanks of 1,100 gallons or less used noncommercially. State and local rules may still apply. An excluded tank can still leak, and contamination still matters.
Look for tank records, location, contents, age, testing, closure and release information. An empty tank isn’t necessarily properly closed, and removing a tank doesn’t prove the soil around it is clean. Petroleum releases are usually handled under UST and state law, not CERCLA.
Work the example
A buried tank supplies heating oil only to the house on the premises.
Does its federal UST exclusion prove there is no environmental concern?
Show the answer and reasoning
No. Investigate condition and applicable state or local rules.
Whether a program covers a tank and whether it has leaked are two different questions.
UST: 10% or more of the system’s volume underground. Heating-oil tanks for on-site use are excluded.
Sources for this section
- Federal sourceEPA, underground tank definition, risks and federal exclusions
- Federal law42 U.S.C. § 9601, hazardous substances, petroleum and landowner definitionsStatute or regulation reproduced by Cornell's Legal Information Institute.
20 / N6.A · Understand the rule
Read a site’s history before planning its reuse
A brownfield is property whose expansion, redevelopment or reuse may be complicated by actual or potential hazardous substances, pollutants or contaminants. It need not be visibly dirty or already proven contaminated. A former industrial use can justify investigation even when the buildings have been demolished.
A waste disposal site may have contaminated soil, groundwater, landfill gas, settlement or land-use restrictions. A permitted landfill, a brownfield and a site on the Superfund National Priorities List are three different things. Search the records and assess the specific parcel and its neighbors.
RCRA governs solid and hazardous waste management, tracking hazardous waste from generation through disposal. CERCLA covers releases and cleanup liability. Cleanup and reuse programs can make redevelopment possible, but grants, liability protection and unrestricted residential use don’t come with the brownfield label.
Work the example
A vacant factory parcel may have solvent contamination, but no sampling has confirmed it.
Can it still be considered a brownfield?
Show the answer and reasoning
Yes. Potential contamination can complicate reuse.
The definition does not require a confirmed laboratory result before redevelopment concerns arise.
Brownfield: reuse may be complicated by real or potential contamination. Proof isn’t required.
Sources for this section
- Federal law42 U.S.C. § 9601(39), brownfield definition and exclusionsStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal sourceEPA, Resource Conservation and Recovery Act
- Federal sourceEPA, Phase I and Phase II assessment and cleanup follow-up
21 / N6.A · Understand the rule
Read probability, location and history together
The base flood has a 1 percent chance of being equaled or exceeded in any given year. Calling it the hundred-year flood does not mean floods occur exactly a century apart. Two major floods can occur in consecutive years. A Special Flood Hazard Area is associated with the mapped base-flood risk.
A and V zone families identify high-risk areas; V zones also involve coastal wave hazards. Shaded X generally represents moderate risk, while unshaded X generally represents lower risk. Lower risk is not no risk. Check the current effective FEMA Flood Insurance Rate Map, amendments or revisions, local information and known flood history.
The base flood elevation is the height the base flood’s water surface is expected to reach, not a promised depth above every floor. Map boundaries, the building’s location and elevation information all affect decisions. Floodplain status, a prior loss and an insurance requirement are related but different facts. A map never cancels a known flood history.
Work the example
A property experienced the base flood last year.
Does that remove the chance of another base flood this year?
Show the answer and reasoning
No. The 1 percent measure is an annual probability, not a schedule.
The label does not promise a ninety-nine-year gap between events.
1% annual chance flood = 100-year flood. It can happen two years in a row.
Sources for this section
- Federal sourceNFIP, base flood, elevation and flood insurance definitions
- Federal sourceNFIP, flood zones, maps and remaining risk
- Federal sourceFEMA Flood Map Service Center, effective maps and map changes
22 / N6.A · Understand the rule
Flood risk versus the lender’s flood insurance requirement
Most standard homeowners policies don’t cover flood damage. NFIP and private flood insurance are both options, each with its own eligibility and terms. Building and contents coverage are bought separately, and limits, exclusions, deductibles and basement restrictions matter.
Mandatory purchase rules generally apply to federally related loans secured by buildings or mobile homes in a Special Flood Hazard Area in a participating community. That includes regulated lenders’ conventional loans, not just FHA loans. A lender may also require coverage outside the mapped high-risk area. A cash purchase doesn’t eliminate flood risk.
NFIP coverage generally starts after a 30-day waiting period, with exceptions, including a policy bought in connection with making, increasing, extending or renewing a loan. Private policies have their own terms. Arrange insurance early instead of buying a policy as a storm approaches. Regulated lenders must accept private flood policies that meet the regulation’s definition.
Work the example
A buyer wants a new NFIP policy to cover a storm tomorrow. No waiting-period exception applies.
Should the agent promise immediate coverage?
Show the answer and reasoning
No. The NFIP waiting period is generally 30 days.
Verify the effective date and policy requirements rather than assuming purchase starts coverage immediately.
Mandatory flood insurance: SFHA + participating community + federally related loan. NFIP waits 30 days.
Sources for this section
- Federal sourceNFIP, coverage, purchase and waiting periods
- Federal law12 CFR § 339.3, FDIC lender flood coverage and private policiesStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal law12 CFR § 339.2, designated loans and flood insurance definitionsStatute or regulation reproduced by Cornell's Legal Information Institute.
23 / N6.A · Understand the rule
Recognize the Clean Air Act’s job
The Clean Air Act regulates air emissions from stationary and mobile sources. EPA sets national ambient air-quality standards and addresses hazardous air pollutants, while states have important implementation roles. Think emissions and air quality when distinguishing it from waste cleanup and water-discharge laws.
Real estate decisions can involve industrial air permits and asbestos rules for some demolition or renovation work. A zoning approval doesn’t substitute for an environmental permit.
The Act isn’t a seller-disclosure form, and it doesn’t certify that a home has passed indoor-air tests. An air-quality standard, a work practice and a disclosure duty answer different questions.
Work the example
A question asks which federal law principally addresses emissions from an industrial smokestack.
Which law is the best match?
Show the answer and reasoning
The Clean Air Act.
Air-emissions regulation is a different job from CERCLA cleanup liability.
Clean Air Act: air emissions and national ambient air-quality standards.
Sources for this section
- Federal sourceEPA, Clean Air Act summary
- Federal sourceEPA, asbestos emissions rules for demolition and renovation
24 / N6.A · Understand the rule
Distinguish discharge permits from drinking-water rules
The Clean Water Act regulates pollutant discharges into waters of the United States and addresses surface-water quality. Its NPDES permit program generally covers point-source discharges, such as wastewater coming out of a pipe.
Section 404 addresses discharges of dredged or fill material into covered waters, including covered wetlands. A development can need more than a local building permit. EPA, the Army Corps of Engineers, authorized states and other authorities have different roles under the relevant programs.
The Safe Drinking Water Act is a different law that covers public drinking-water systems. A wastewater discharge permit, drinking-water testing and a private well’s condition are three different things. Whether a particular water or activity is covered requires a current jurisdictional analysis.
Work the example
A developer proposes discharging fill into a federally covered wetland.
Which Clean Water Act program is directly relevant?
Show the answer and reasoning
Section 404.
Dredged or fill material is the specific activity addressed by that program.
Clean Water Act: NPDES for pipe discharges, Section 404 for dredge and fill.
Sources for this section
- Federal sourceEPA, Clean Water Act and point-source discharges
- Federal sourceEPA, Clean Water Act section 404 permits
- Federal sourceEPA, Safe Drinking Water Act summary
25 / N6.A · Understand the rule
Confirm jurisdiction before promising buildable land
Wetland protection can limit filling, draining and development. A wetland that’s dry on the day of a showing can still be protected, and a wet-looking area isn’t necessarily under every federal program. Delineation, federal jurisdiction and state or local protection are three different determinations.
After the Supreme Court’s Sackett decision, federal jurisdiction over adjacent wetlands depends on a continuous surface connection to covered waters. EPA’s status page describes differing implementation because of litigation. As of November 2026, the September 2026 supplemental WOTUS proposal is still a proposal, not an effective final rule.
For an actual parcel, get current information from the Corps district and state or local authorities. Federal non-coverage doesn’t erase state or local protections. If Section 404 applies, the analysis starts with avoiding impacts, then minimizing them, then compensating for unavoidable ones. Buying mitigation credits doesn’t guarantee a permit.
Work the example
A buyer sees a dry field on a summer visit and wants the agent to guarantee that it has no wetland restrictions.
What is the sound response?
Show the answer and reasoning
Arrange appropriate delineation and jurisdictional review before making that claim.
One visit cannot settle seasonal conditions or the different layers of regulation.
Before calling land buildable, check federal, state and local wetland rules for that parcel.
Sources for this section
- Federal sourceEPA, Clean Water Act section 404 permits
- Federal sourceEPA, effective WOTUS framework and litigation status
- Federal rulemaking documentSeptember 2026 WOTUS supplemental proposal, not a final ruleRead the document's status and effective date; a proposed rule is not a final rule.
26 / N6.A + N6.B · Understand the rule
Who can be liable under CERCLA
CERCLA, commonly called Superfund, authorizes responses to releases or threatened releases of hazardous substances and sets out who is liable. Potentially responsible parties are current owners and operators, owners and operators at the time of disposal, arrangers, and transporters who selected the disposal site.
Liability is strict, so lack of negligence isn’t a defense. It’s retroactive, reaching conduct before the 1980 law. It’s joint and several when the harm isn’t divisible, so one liable party can face the whole cleanup claim. Defenses, statutory protections, allocation and contribution still matter.
A past owner is liable only if it owned the site at the time of disposal, and not every hazardous condition falls under CERCLA. The statute excludes petroleum, among other limits. A gas-station release may fall under UST and state law even though CERCLA doesn’t cover the petroleum.
Work the example
A current owner did not cause a qualifying hazardous-substance release and argues that this fact alone ends the CERCLA inquiry.
Is lack of personal fault enough?
Show the answer and reasoning
No. Ownership can create exposure unless a defense or protection applies.
Strict liability doesn’t require proof of negligence, but statutory defenses and protections still apply.
CERCLA liability: strict, retroactive, and joint and several. Petroleum is excluded.
Sources for this section
- Federal sourceEPA, Superfund liable parties and liability standards
- Federal law42 U.S.C. § 9607, liability, defenses and indemnity limitsStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal law42 U.S.C. § 9601, hazardous substances, petroleum and landowner definitionsStatute or regulation reproduced by Cornell's Legal Information Institute.
27 / N6.A · Understand the rule
Connect the 1986 amendments to Superfund
SARA is the Superfund Amendments and Reauthorization Act of 1986. It amended CERCLA, emphasizing permanent remedies, treatment technology, health protection, state involvement and stronger enforcement tools. It did not replace Superfund with a routine home-inspection program.
SARA Title III is the Emergency Planning and Community Right-to-Know Act, or EPCRA. It addresses emergency planning and specified chemical reporting by covered facilities. Community chemical information can help due diligence, but it is not a substitute for evaluating a particular site.
Keep the vocabulary straight: EPA is the federal agency; CERCLA is the cleanup and liability statute; SARA amended it in 1986; EPCRA covers emergency planning and community right-to-know. State environmental programs can add obligations.
Match the law to the issue
Clean Air Act
- Main role
- Air pollution and emission standards
- Property connection
- Some asbestos demolition or renovation work has its own emissions requirements.
Clean Water Act
- Main role
- Covered pollutant discharges and dredged or fill material
- Property connection
- NPDES and Section 404 are different permit programs.
CERCLA
- Main role
- Response to hazardous-substance releases and liability
- Property connection
- A petroleum-only leak falls under CERCLA’s petroleum exclusion; look to UST and state rules.
SARA / EPCRA
- Main role
- 1986 CERCLA amendments; Title III emergency planning and community information
- Property connection
- EPCRA addresses specified emergency planning and chemical-reporting duties.
RCRA
- Main role
- Solid and hazardous waste management
- Property connection
- Treatment, storage and disposal duties differ from CERCLA cleanup liability.
Work the example
A question describes the 1986 law that amended and reauthorized Superfund.
Which abbreviation fits?
Show the answer and reasoning
SARA.
CERCLA is the original framework; SARA is the 1986 amendment and reauthorization.
SARA (1986) amended CERCLA. SARA Title III is EPCRA.
Sources for this section
- Federal sourceEPA, Superfund Amendments and Reauthorization Act
- Federal sourceEPA, emergency planning and community right to know
28 / N6.A · Understand the rule
What a Phase I covers
A Phase I Environmental Site Assessment evaluates current and historical uses, records, interviews and site observations to identify evidence of environmental concerns. It includes attention to adjoining properties and relevant data gaps. An environmental professional draws the conclusions; a licensee’s quick database search is not equivalent.
A standard Phase I doesn’t sample soil or groundwater. A recognized environmental condition signals a release, a likely release or a material threat of one; it isn’t necessarily a confirmed lab result. Read the actual finding and the recommended follow-up.
A Phase I isn’t a building inspection. Asbestos, lead paint, mold, radon and similar issues may need their own services. A favorable conclusion is limited by the report’s date, limitations, inaccessible areas and purpose. It doesn’t guarantee that no contaminant exists anywhere on the property.
Work the example
A consultant reviews historic maps, interviews former operators and inspects a parcel without taking soil samples.
Which assessment stage does that describe?
Show the answer and reasoning
Phase I.
Records, interviews and observation are Phase I work. Sampling comes later, in Phase II.
Phase I: records, interviews and a site visit. No sampling.
Sources for this section
29 / N6.A · Understand the rule
Use targeted sampling to answer the next question
A Phase II Environmental Site Assessment uses a professionally designed investigation, often including soil, groundwater, soil-gas or other sampling and laboratory analysis, to evaluate suspected contamination. The plan follows the substances and locations of concern rather than testing randomly for everything.
A positive finding may require more work to define the extent, exposure pathways and appropriate response. A negative sample does not prove an entire parcel is clean if the sampling scope did not address other areas or substances. Read the investigation’s limitations and conclusions.
A Phase II is investigation, not remediation, and it doesn’t release anyone from liability. Cleanup planning, regulatory approvals, corrective work, monitoring and any restrictions come after. The sequence can change as new information appears; not every transaction follows a rigid three-step formula.
Work the example
Soil samples identify solvents near an old disposal area. No cleanup work has occurred.
Does completion of Phase II mean remediation is complete?
Show the answer and reasoning
No. Investigation identified a condition; cleanup hasn’t started.
Testing and cleanup are different activities.
Phase II: targeted sampling of a suspected problem. Cleanup comes after.
Sources for this section
- Federal sourceEPA, Phase I and Phase II assessment and cleanup follow-up
- Federal sourceEPA, institutional controls and restricted site reuse
30 / N6.A + N6.B · Understand the rule
The one-year and 180-day AAI deadlines
All Appropriate Inquiries, or AAI, is a defined process used for certain CERCLA landowner protections. EPA recognizes ASTM E1527-21 for Phase I assessments and E2247-23 for forestland or rural property as consistent with AAI. Calling a report a Phase I doesn’t make it compliant.
AAI generally has to be done within one year before acquisition. Five components must be done or updated within 180 days before acquisition: interviews, cleanup-lien searches, government-record reviews, visual inspections of the site and adjoining properties, and the environmental professional’s declaration. The report’s cover date isn’t the date of each component.
The buyer has duties too, including sharing specialized knowledge and information about the price and property. Significant data gaps must be addressed in the report. An investigation done after purchase can’t satisfy a pre-acquisition requirement, and a new Phase II doesn’t fix an outdated AAI component.
Work the example
A Phase I report is dated last month, but its required site inspection occurred 220 days before the planned purchase and was never updated.
Is the cover date enough to satisfy the 180-day rule?
Show the answer and reasoning
No. Check and update the required component before acquisition.
The component’s actual date controls this timing question.
AAI: within 1 year of acquisition, with five components updated within 180 days.
Sources for this section
- Federal sourceEPA, All Appropriate Inquiries and recognized assessment standards
- Federal law40 CFR § 312.20, inquiry components and acquisition deadlinesStatute or regulation reproduced by Cornell's Legal Information Institute.
31 / N6.B · Understand the rule
Innocent landowner versus bona fide prospective purchaser
Certain buyers may qualify as innocent landowners, contiguous property owners or bona fide prospective purchasers, each with its own criteria. Innocent-landowner protection generally requires that the buyer did not know and had no reason to know of the contamination after the required inquiry. Simply choosing not to investigate is not a defense.
A bona fide prospective purchaser (BFPP) can knowingly buy contaminated property and still be protected. Threshold conditions include acquisition after January 11, 2002, disposal before acquisition, all appropriate inquiries before acquisition and no prohibited affiliation with a liable party. Continuing obligations include required notices, cooperation and access, reasonable steps about releases, responses to information requests and compliance with land-use restrictions. Missing any one can cost the protection.
A seller’s indemnity can allocate costs between the parties, but it doesn’t transfer CERCLA liability owed to the government. A lender’s, insurer’s or seller’s promise of protection doesn’t replace environmental and legal review. Insurance and liability protection cover different things.
Work the example
A buyer knowingly acquires a contaminated site after proper inquiry and meets every stated BFPP condition and continuing obligation.
Does knowledge alone disqualify the buyer from BFPP protection?
Show the answer and reasoning
No. BFPP protection can allow knowing acquisition when its conditions are met.
The BFPP rules allow knowing purchase. The innocent-landowner defense is the one that requires no knowledge.
Innocent landowner: didn’t know after AAI. BFPP: may know, but must meet every condition.
Sources for this section
- Federal sourceEPA, bona fide prospective purchasers and continuing obligations
- Federal sourceEPA, landowner liability criteria and continuing obligations
- Federal law42 U.S.C. § 9607, liability, defenses and indemnity limitsStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal law42 U.S.C. § 9601, hazardous substances, petroleum and landowner definitionsStatute or regulation reproduced by Cornell's Legal Information Institute.
32 / N6.B · Understand the rule
Engineering and institutional controls
Cleanup can leave residual contamination managed through engineering or institutional controls. An engineering control is a physical measure, such as a cap or vapor-control system. An institutional control is a legal or administrative restriction, such as a limit on residential use or groundwater withdrawal.
A site approved for a commercial use isn’t approved for homes, a child-care use or unrestricted digging. Review cleanup decisions, recorded restrictions, monitoring and maintenance duties and the proposed use. Disturbing a cap can affect both exposure and compliance.
Disclose known restrictions and conditions as the law requires, and get specialist advice before changing the use. Read a no-further-action letter for its scope and conditions. Removing a tank, getting an agency letter or recording a deed doesn’t mean every environmental obligation has ended.
Work the example
A remediated parcel has a recorded restriction allowing industrial use only. A buyer plans apartments.
Does the cleanup approval authorize the apartments?
Show the answer and reasoning
No. The apartments have to be evaluated against the restriction.
A remedy can be protective for a limited use without allowing unrestricted residential exposure.
Engineering control = physical (a cap). Institutional control = legal (a deed restriction).
Sources for this section
33 / N6.A · Understand the rule
What an EIS is for
An Environmental Impact Statement is part of NEPA review for a proposed major federal action expected to significantly affect the human environment. It considers the proposed action, alternatives and environmental effects. It isn’t a document required for private home sales.
Depending on the facts, a federal agency’s review may end in a categorical exclusion, an Environmental Assessment and a Finding of No Significant Impact, or an EIS. A NEPA Environmental Assessment isn’t the same as a Phase I Environmental Site Assessment for a property purchase.
An EIS informs the agency’s decision and includes public participation. It doesn’t certify that a property is free of contamination or guarantee that the project will be approved. On the exam, look for the federal action and its environmental effects.
Choose the right assessment
Phase I
- Purpose
- Records, interviews, site observations and professional conclusions
- Limit
- No sampling. Asbestos, radon and similar building issues need their own agreed scope.
Phase II
- Purpose
- Targeted sampling and analysis
- Limit
- Samples for the identified concerns. Not proof of a clean site and not cleanup.
Environmental impact statement
- Purpose
- Evaluation of significant effects and alternatives for a covered federal action
- Limit
- A NEPA review document, not a substitute for property acquisition due diligence.
Work the example
A federal agency evaluates alternatives and significant environmental effects of a major project.
Is that purpose the same as a purchaser’s Phase I contamination inquiry?
Show the answer and reasoning
No. An EIS serves a different decision and legal framework.
NEPA project review and property-purchase due diligence are related topics, but they’re different reports for different decisions.
EIS: evaluates a major federal action. Phase I ESA: evaluates one property.
Sources for this section
- Federal sourceEPA, NEPA environmental assessment and impact-statement review
- Federal law42 U.S.C. § 4332, federal environmental review and alternativesStatute or regulation reproduced by Cornell's Legal Information Institute.
- Federal sourceEPA, Phase I and Phase II assessment and cleanup follow-up
34 / N6.B · Understand the rule
Turn the findings into a clear next step
Start with the known fact, its source and the unresolved question. Obtain complete reports and relevant records, identify the applicable disclosure duties, and arrange qualified investigation with the buyer’s informed authorization. Do not diagnose beyond your expertise or treat an owner’s reassurance as a technical report.
Read inspection contingencies, access permissions, notice methods and deadlines. If more investigation is needed, a written extension may be necessary before the existing deadline expires. Any repair, credit, escrow or termination agreement must be validly documented; disclosure alone does not tell you which remedy the parties have chosen.
Before closing, verify required delivery, agreed work and any follow-up evidence, insurance effective dates and continuing restrictions. National principles, federal rules and state transaction requirements each apply on their own terms. The goal is an informed decision backed by records, not a promise that every risk is gone.
Try a different fact pattern
Review the environmental decision
Six short scenarios. Pick a response, check the reasoning, then change the situation. These exercises are for learning; the linked practice saves your study history.
A reliable radon test reports 3.3 pCi/L. A seller calls the property risk-free.
Work the example
A Phase I recommends sampling, but the buyer’s inspection deadline expires tomorrow.
What should the agent address promptly?
Show the answer and reasoning
Qualified follow-up, the contract deadline and any needed written extension.
Ordering more work doesn’t extend the buyer’s contract deadlines.
If more testing is needed, get a written extension before the deadline passes.
Sources for this section
- Industry policyNAR 2026 Code, competence and legal-practice boundaries: membership standardsNAR or MLS policy. Check which participants and listings it covers.
- National concept referenceCalifornia DRE, contract concepts and transfer: state reference, general principles onlyAnother state's teaching guide, used for general concepts. Its state-specific rules do not establish Pennsylvania law.
- Federal sourceEPA, All Appropriate Inquiries and recognized assessment standards
- Pennsylvania authority49 Pa. Code § 35.284a, licensee disclosure responsibilities
Use it on the next scenario
Eight checks that prevent common mistakes.
- Name the task
- Disclosure informs; inspection investigates; repair changes the condition.
- Waiving one task leaves the others in place.
- Read the exception
- Who, what building, which transaction and which conditions?
- Pre-1978, zero-bedroom, short lease and lead-free are starting facts, not complete conclusions.
- Remember lead timing
- Before obligation; purchaser evaluation generally 10 days; records at least 3 years.
- A written evaluation waiver does not waive required reports.
- Treat numbers carefully
- Radon: fix at 4 pCi/L or above; consider reduction from 2 to 4.
- EPA guidance is not a guarantee of zero risk or a universal sale-cancellation law.
- Check the flood facts
- Map, actual history, elevation, lender and policy.
- One percent annual chance does not mean once every hundred years.
- Choose the right assessment
- Phase I identifies concerns; Phase II investigates with sampling.
- Neither title means the property has been cleaned up.
- Check acquisition dates
- AAI: one year overall; five specified components within 180 days.
- Use the actual work dates and the planned acquisition date.
- Read what survives cleanup
- Residual conditions, engineering controls, use restrictions and continuing obligations.
- An indemnity or clean-looking property does not erase statutory liability.
Put it together
Review a conversion before committing.
A buyer plans to turn a former industrial property into apartments. The seller supplies a Phase I with interviews from eight months ago and says cleanup made the site safe for any use. The records describe an engineered cap and an industrial-use restriction. A building on the site has flooded twice despite being outside the mapped high-risk zone. A separate 1966 house is included in the sale, with no lead-disclosure exception.
Which five checks belong in the file before the buyer commits or acquires the property?
Check your property-file review
- Complete the house’s lead process. Deliver required information before obligation and provide the purchaser’s evaluation opportunity or valid written waiver.
- Check each AAI component date. Eight-month-old interviews need attention under the 180-day rule; a new report cover is not enough.
- Read the cleanup limits. The cap and industrial-use restriction matter to a proposed residential conversion.
- Investigate the flood history. The mapped zone does not erase known flooding or resolve insurance and disclosure questions.
- Plan the legal and technical review. Assessments, acquisition timing, protection criteria and continuing obligations belong in the plan.
Before you practice
Close the notes and talk through it.
- Why do disclosure, inspection and repair remain separate even in an as-is sale?
- Which facts change a federal lead exception, and what does a written evaluation waiver leave in place?
- How do radon, asbestos, mold and vapor intrusion differ in source and investigation?
- Why can flood history matter outside a mapped high-risk zone?
- What do Phase I, Phase II and an environmental impact statement actually do?
- Which work must be current before acquisition, and which obligations can continue afterward?
Now try it with different facts.
116 disclosure and environmental scenarios, at your pace. Every choice has an explanation, and every question links to its sources and teaching section. Your answers join the same review queue as your other practice.
Start free disclosure and environmental questionsScope and review
Content checked on November 15, 2026 against Pearson’s national outline effective April 1, 2025, the linked federal regulations and statutes, EPA materials, flood-insurance sources and labeled state examples. General property-disclosure forms, duties and remedies vary by state. The September 2026 federal waters proposal is identified as proposed, not effective final law. Agency recommendations are distinguished from transaction mandates. These are original study questions, not actual Pearson items. This lesson and its linked practice are free, with no account required and no required education credit.